Anderson

Community Action Calls Attention to Traffic Dangers on Greenfield Avenue

Slow Down Greenfield action on Aug. 25, 2023

At the tail end of rush hour on Aug. 25, more than 60 Greenfield parents and school-age children—some accompanied by family dogs—stood along Greenfield Avenue holding handmade signs that encouraged motorists to drive safely. They were taking part in Slow Down Greenfield, a street action organized by Greenfield resident and mother of three Anna Dekleva.

Ms. Dekleva told us she started Slow Down Greenfield in the wake of an Aug. 16 accident on the dangerous street that injured a 12-year-old and in support of a petition co-sponsored by the Greenfield School PTO and the Greenfield Community Organization (GCA).

Obvious, long-standing danger zones

The Keep Kids Safe with Traffic Calming on Greenfield Ave! petition asks Pittsburgh’s Department of Mobility and Infrastructure (DOMI) to restore the school safety zone around Greenfield School and Yeshiva School (formerly St. Rosalia’s). It also calls on DOMI to add traffic-calming and pedestrian safety features on Greenfield Avenue at its intersections with Ronald and McCaslin streets, as well as the stretch between Kaercher and Irvine/Saline streets.

Concerns escalated after 12-year-old Cameron Grimes was struck and injured near the McCaslin intersection named in the petition. Children and seniors frequently cross there to access Magee Playground and Magee Rec Center. And residents south of the Kaercher intersection have witnessed numerous wrecks, totaled parked cars, sideswipes, and countless near misses over the years. More than 560 people have signed the petition so far.

We have needed traffic calming and ways for students to safely walk to and from school, and to and from the rec center, for years. Now a child has been hit. What will it take? I recently stood with my child at a STOP SIGN for three cycles before cars actually let us cross Greenfield at McCaslin. Cars never slow down at Greenfield and Kaercher, even though there is a cross walk. Motorists are not safe in this space and we need engineering to make them be safe.

—Petition comment

Greenfielders speak out

Catherine Adams, who serves as co-chair of the GCA’s Planning, Transportation, and Development Committee and co-wrote the petition, attended the action and lauded Ms. Dekleva’s quick organizing.

“This type of event is an easy way to build and strengthen the community,” she told us in an Aug. 27 email. She noted that along with driver awareness, “we also need infrastructure that prevents vehicles from traveling at high speeds in areas with a lot of pedestrians, many of them kids. A speed limit sign doesn’t prevent a vehicle from traveling too fast, but infrastructure changes can.”

“A lot of the drivers who passed us slowed down, gave us thumbs up and waved,” observed Daniel Tkacik, who participated with his 18-month-old son Felix and family dog Louie. “Greenfield is a neighborhood full of families with children… We need street design that discourages fast, dangerous driving.”

District 5 Councilperson Barb Warwick commented after attending the action, “I’m really proud of my Greenfield neighbors who came out to advocate for safer streets for our kids. As residents, we need to start prioritizing safety over convenience and traffic flow. Our local communities know the danger zones, so that’s where we should start.”

Traffic safety improvements were a major plank of Councilor Warwick’s successful campaign to replace Corey O’Connor in last year’s special election.

Obvious, long-standing neglect

Over several years, Greenfield residents have lobbied city government for better traffic safety in the neighborhood, but their pleas have been ignored. Since DOMI’s 2017 inception, residents have repeatedly asked when DOMI will meet with them to collaborate on traffic safety measures and when those measures would be implemented. DOMI’s responses have ranged from non-committal to non-existent.

DOMI project manager Zachary Workman acknowledged at a July 14, 2022, public meeting about the planned replacement of the Swinburne bridge that “DOMI is aware of dangerous traffic conditions along Greenfield Avenue that led to repeated requests for traffic-calming measures.”

“It’s definitely something that’s on DOMI’s radar for improvements in the future,” he said, “but they are going to be—it’s something that we’ll—it’s in the long-range plan as resources become available.”

pictures of three car wrecks that occurred on or near Greenfield Avenue in 2022
(L-R) Emergency crews respond to a five-car accident on May 22, 2022, at the intersection of Greenfield and Hazelwood avenues; a car lies flipped on its side after a June 23, 2022, wreck on the 300 block of Greenfield Avenue that witnesses say required first responders to use Jaws of Life to rescue the driver; a car teeters at the top of a steep hill after jumping a curb on the same block of Greenfield Avenue on Dec. 31, 2022.

The Swinburne Bridge project was originally slated for completion in 2026. But after an inspection revealed that Anderson Bridge in Schenley Park needed repairs right away, DOMI had to delay the Swinburne project so that both bridges would not be closed at the same time.

Aside from the usual traffic, traffic has tremendously increased due to the Anderson Bridge closing and its plan to not open until 2025, traffic is more congested, drivers more anxious to get home, and increase for drivers to not obey traffic regulations.

—Petition comment

The wrecks keep coming

On the afternoon of Aug. 30, as this report was being finalized, another accident occurred on Greenfield Ave. A driver traveling east on the 800 block swerved and hit a legally parked truck, then flipped over. Fortunately, the couple and their young child who were in the car sustained no injuries.

Aug. 30 wreck on Greenfield Avenue
An eastbound car traveling along the 800 block of Greenfield Avenue flipped after hitting a parked truck on Aug. 30. Photo on left courtesy of Ed Goyda; center and right photos courtesy of Kris Olsen.

“Action is needed now”

DOMI’s intention to leave Greenfield Avenue as-is until reconstruction of Swinburne Bridge is finished prolongs conditions that put residents of all ages at risk. Cameron Grimes’ injuries have exacerbated Greenfielders’ frustration at DOMI’s neglect of basic safety improvements—especially as they see millions of tax dollars being spent on the very same solutions in more affluent surrounding communities.

“I understand there are needs throughout the entire city,” said Ms. Adams, “but it’s hard to be patient when pedestrians are getting hit by cars in your neighborhood.”

Asked what she would say to Mayor Gainey, Ms. Dekleva responded in an Aug. 27 email, “I would say this is an easy fix request being asked here; get a traffic engineering team activated and install traffic calming measures today, before another person is hit or killed. We don’t need a magic wand or any further extended theoretical deliberation…Action is needed now or more residents will be maimed or die from a problem the city can address today.”

Councilor Warwick told us, “Traffic calming doesn’t have to be complicated, and as a city, we need to be implementing simple, common-sense fixes while we work on larger-scale projects.”

Slow Down Greenfield rides again (soon)

Ms. Dekleva said she valued being part of this action with her neighbors and plans to schedule another one—possibly the weekend after Labor Day. 

She told us during an Aug. 21 phone call, “I think that the tremendous history of working-class solidarity is alive and well in Greenfield—something we all love about Greenfield. This is not something people will let go, and we will be heard for sure.”

Now We Can Has CommUnity Input?

cheezburger cat looming over Swinburne Bridge

After Charles Anderson Memorial Bridge abruptly closed in February, Pittsburghers welcomed Mayor Ed Gainey’s announcement that the city will complete a full rehabilitation—even though it means the bridge will remain closed for a few years instead of the four months originally projected for temporary repairs.

Emily Bourne, a press officer in Mayor Gainey’s office, wrote in an April 13 email, “Charles Anderson design is tentatively set to finish in Fall 2023 with construction anticipated to begin in Spring 2024. Ideally the bridge would reopen to traffic by late 2025.”

Residents of The Run who live around nearby Swinburne Bridge, also scheduled for replacement, have questions about what the new plan means for them. Until the city closed Anderson Bridge, Swinburne Bridge had been on track to be replaced first. The Run was threatened with erasure by the Mon-Oakland Connector (MOC) shuttle road, which Mayor Gainey halted in February 2022. The planned MOC route included a rebuilt Swinburne Bridge with a dedicated shuttle lane.

As the Swinburne Bridge project moves forward without the MOC, Pittsburgh’s Department of Mobility and Infrastructure (DOMI) has continued its odious track record of prioritizing high-powered profiteers above communities. But the Anderson Bridge closure gives DOMI an opportunity to change course. They should reset the Swinburne Bridge project to include public decision-making—even if that means a short delay.

A tale of three bridges and one dangerous street

The first public meeting about rehabilitating Anderson Bridge hasn’t been scheduled yet, but DOMI has already posted a presentation about it on the project’s Engage Pittsburgh webpage. After the Fern Hollow Bridge collapsed in early 2022, Pittsburgh officials told the public to expect limited involvement in the rebuild because of its urgent nature. Even so, artists and residents had time to discuss ways to honor the span’s history and connection to Frick Park.

By contrast, DOMI ignored repeated requests for DOMI’s presentation on plans for Swinburne Bridge until about four hours before the first of only two public meetings on the project. Then project manager Zachary Workman posted a statement denying the requests. DOMI’s community outreach consisted of a letter sent to a few residents who live near the bridge, which they received 10 days before the original meeting date.

At the July 2022 meeting, representatives from DOMI, PennDOT, and private construction firm Alfred Benesch & Company all acknowledged that work on Swinburne Bridge will profoundly affect The Run. A significant portion of the neighborhood—and the only street providing vehicular access to it—lies directly beneath the bridge.

DOMI painted a rosy picture of plans to minimize disruptions to the community, but avoided promising that residents would not have their homes taken through eminent domain. They also avoided any commitment to calm dangerous traffic along Greenfield Avenue.

DOMI ruled out even adding a traffic signal at the intersection of Swinburne Bridge and Greenfield Avenue until after construction on Swinburne Bridge wraps up in 2026 (at the earliest). Residents have been advocating traffic-calming measures along the nearby 300 block of Greenfield Avenue for more than eight years. They face speeding traffic every time they walk between their houses and cars. Several accidents, including some that totaled parked vehicles, occurred there in 2022 alone.

Moving traffic without mowing down residents

Affected residents, commuters, and DOMI all agree that closing Anderson and Swinburne bridges at the same time would cause far-reaching traffic nightmares.

According to Ms. Bourne, “Based on the traffic observed with Charles Anderson being closed, it is apparent that construction cannot begin on the Swinburne replacement project until Charles Anderson has reopened to traffic.”

While Anderson Bridge remains closed, the posted detour includes Greenfield Avenue.

Bumper-to-bumper traffic now provides a brief respite from leadfooted drivers during rush hour, but the rest of the time, they continue to speed.

Whose needs is DOMI serving?

There is no getting around the fact of competing priorities for Greenfield and Hazelwood. Residents need safer streets, while investors in the Hazelwood Green development have long desired a “permanent, rapid link that moves traffic as quickly as possible between their site and Oakland university campuses. This explains DOMI’s continued prioritizing of MOC-related projects above community needs even after the MOC’s demise.

Taxpayer-funded institutions should be working against such an extreme power imbalance instead of deepening it. We are calling for DOMI to:

  1. Prioritize the physical safety of existing residents by adopting the Our Money, Our Solutions plan. Residents from MOC-affected neighborhoods created the plan in 2019 to point out infrastructure improvements Pittsburgh should be funding instead of the MOC. Several items in the plan have since been addressed—but not traffic calming on Greenfield Avenue.

  2. Follow the public engagement guidelines/demands posted at junctioncoalition.org/2022/07/26/pittsburgh-community-engagement-needs-more-of-both/. These are commonsense provisions like notifying the public of meetings and sharing presentations at least 14 days in advance so that people can come prepared with relevant questions. City officials are aware of these guidelines but have not responded.

  3. Reboot the Swinburne Bridge Project, starting with additional public meetings. The next public meeting is not scheduled to be held until the “final design” phase of the project. Plans established before the first meeting call for a rushed, cookie-cutter design that skipped public input. With work on Anderson Bridge expected to last at least through 2025, there is plenty of time to reassess this approach—and no excuse not to.