8 Urgent Questions for PWSA Board of Directors Re. Stormwater Project

On February 26, 2021, Ziggy Edwards of The Run addressed PWSA’s board of directors at their monthly meeting. She brought concerns from her neighborhood that the design and implementation of PWSA’s Four Mile Run (4MR) Stormwater Project suffers from skewed priorities. The project, which will include major construction on the only road into The Run, focuses on accommodating the Mon-Oakland Connector (MOC) rather than fixing severe flooding.

The following questions, which PWSA also received via email, are based on information in the Right-to-Know (RTK) request documents we have received so far and independent expert analysis of the plan submitted with the permit application to the PA Department of Environmental Protection and the US Army Corps of Engineers.

1. Why did the Heinz Endowments pay Howard Neukrug (past Philadelphia Water Commissioner) to review the PWSA stormwater project? (source: PWSA/CEC 4MR Weekly Meeting Minutes, April 16, 2019)

2. How much of the $40 million for the PWSA stormwater project did not come from the Heinz Endowments and/or other foundations that own the Hazelwood Green development?

3. How can the three new PWSA board members, who all have ties to entities with vested interests in the Hazelwood Green (HG) development, oversee the stormwater project in a fair and impartial manner that doesn’t benefit HG at the expense of Schenley Park and residents in The Run? For that matter, how can the other board members be fair and impartial in this project when they were all directly nominated by Mayor Peduto (a longtime proponent of the MOC)?

4. As you may know, the proposed MOC adds at least 0.80 acres (34,850 square feet) of paving to Junction Hollow. With the types of storms Pittsburgh has had in the past 10 years, a year with 50 inches of rain would generate an additional 1 million+ gallons of runoff to The Run. Why does the plan in the permit application propose to pollute this stormwater runoff by directing it from the MOC to the existing combined sewer system and not to the new stormwater network that flows directly to the river?

5. Did any consultant not funded by HG owners evaluate the impact of this stormwater project design on The Run? What did the consultants say about the absence of stormwater inlets of pipes along the proposed MOC road? What did they say about the absence of stormwater runoff from the road to the daylighted stream?

6. Is it true that the PWSA stormwater project’s construction plan calls for 4MR Field across Alexis Street from Big Jim’s to be used as a staging area for construction equipment and materials?

7. Because the “Parkway side” of the 4MR watershed is excluded from PWSA’s stormwater project, residents of The Run are still likely to see stormwater arrive in our neighborhood from that side of 4MR—even after this highly disruptive project is completed. Any flood water that enters the combined sewer network above The Run will still be in the combined sewer pipes running under the neighborhood. Therefore, if the volume of stormwater entering the combined sewer pipes above The Run is greater than those combined sewer pipes can handle, we are still likely to see raw sewage come to the surface from the remaining combined sewer inlets and/or manholes. Why is none of the $41 million earmarked for this project, which was billed as a solution to flooding in The Run, being spent on remediating the “Parkway side” of 4MR?

8. Is the PWSA board of directors aware that PWSA was ordered by the Office of Open Records to complete a review and provide the rest of its documents responsive to our RTK request? The deadline was yesterday [February 25, 2021]. At 8:52 p.m. we received a link to a zip file with a password that doesn’t work. Will the board encourage PWSA Attorney Samuel Hornak to resolve this issue as quickly as possible, since PWSA effectively missed the deadline?

Suddenly Swinburne

Schenley Park, Swinburne Street. Why don't we have both?

Proposed shuttle expansion route threatens homes

Developers of the controversial Mon-Oakland Connector (MOC) aren’t deterred by years of setbacks—including widespread community opposition and City Council passing a 2021 budget amendment that shifts funds away from building the new shuttle road through two Pittsburgh neighborhoods and Schenley Park. If anything, plans presented by the Department of Mobility and Infrastructure (DOMI) and Almono Partners at their last public meeting show a stronger resolve to eliminate all obstacles in the MOC’s path.

Slide 11 maps the proposed phase 1 MOC route, which ends abruptly as it enters The Run from Schenley Park. Residents were left in the dark about the path of shuttles through their small neighborhood.

Slide 11 from October 2020 MOC meeting

Although this meeting marked the first time an Almono Partners representative was on hand to answer questions about the shuttle service they plan to run on the road, they did not show The Run in their presentation, either (see slide 37).

Slide 37 from October 2020 MOC meeting
Slide 37 from October 2020 MOC meeting
The slide refers to “trails” (plural) and “public streets” with no indication of which streets in The Run will be used.

The “Swinburne connector” (slide 22) climbs a landslide-prone hillside and merges with Swinburne Street for access to Swinburne Bridge. An FAQ on DOMI’s website says this additional road would “have a path width of 16 feet with 2-foot buffers on each side.” Longtime followers of the MOC debacle and Run residents find this phase 2 plan equally troubling for several reasons.

Slide 22 from October 2020 MOC meeting

For context, we revisit a January 2018 public meeting DOMI organized to “share the potential alternative routes” for the MOC. Run residents had no trust after learning of the plan from a 2015 Pittsburgh Post-Gazette article touting an already-submitted grant application that turned out to be fraudulent. DOMI, created in 2017, claimed they were pushing the restart button on the MOC concept and seeking input from affected communities.

Michael Baker Corporation presented six routes at the meeting, including five community suggestions that left Schenley Park undisturbed. Attendees reported that the exercise seemed designed to herd them toward a conclusion that only the Schenley Park route could work. Alternatives included Swinburne Street.

DOMI director Karina Ricks later expressed a preference for the Swinburne route, but said it was not feasible because of landslides. Landslides have plagued Swinburne Street for decades; one in the 1980s caused damage in Junction Hollow that led the city to close Boundary Street to motorized vehicles. This section of Boundary Street eventually became a popular bike and pedestrian trail through Schenley Park that forms a critical link in the only car-free path between Oakland and downtown.

Given the ongoing landslides, MOC critics questioned Ricks when subsequent designs showed the inevitable Schenley Park shuttle route running along the hill beneath Swinburne Street. How could Swinburne be deemed unsuitable for small shuttles yet frequently accommodate cars, trucks, UPMC shuttles, emergency vehicles, and school buses? And since Swinburne must be stabilized to prevent a collapse onto the proposed road, why not make Swinburne the route instead of spending millions of additional taxpayer dollars to build a new road?

Ricks responded via email, “The mobility path is to be an exclusive pathway suitable for both light shuttles and other e-powered vehicles such as e-bikes and, when categorized, e-scooters and other such vehicles as may evolve over time. There is insufficient width on Swineburn to provided this dedicated path. The street cannot be widened due to the fragile soil conditions.” (emphasis added)

Swinburne Street is 19.8 feet wide on average at its narrowest point. This is significantly wider than the proposed road, which forces cyclists into close contact with shuttles. But the width is still insufficient to accommodate both existing traffic and a new “exclusive pathway” that is “16 feet with 2-foot buffers on each side.” Whatever happened to the fragile soil conditions that prevented Swinburne Street from being widened?

According to minutes from a February 2019 meeting in Mayor Bill Peduto’s office, Ricks “noted the mobility trail can’t support future traffic loads so additional transportation alternatives would be needed for future traffic loads.” DOMI first proposed widening Swinburne Bridge to accommodate a dedicated lane for MOC shuttles in February 2018, presenting an option that featured a vehicle elevator from Four Mile Run Park below. Since then, serious consequences of the Swinburne route have come into view.

2018 DOMI illustration of vehicle elevator concept
Owners of houses near Swinburne Bridge received letters referencing eminent domain.

In August 2020, several Run residents who live near Swinburne Bridge received letters from DOMI implying they may lose their homes and businesses through eminent domain. The bridge has been neglected over many years and needs repair, so residents are required to allow surveyors on their property. Although repairs could be completed with no need to acquire properties, replacing Swinburne Bridge allows DOMI to widen it for the purpose of accommodating a dedicated MOC shuttle lane.

Ricks addressed resident concerns by stating, “It is a letter written by a lawyer and, unfortunately, they do reference the right of eminent domain. The City has absolutely no intention to take properties [as part of the bridge construction]. There is a possibility there might be some slivers that will be needed to create new footings for the bridge.”

Within a week of property owners receiving the letters, an AWK Consulting Engineers team arrived in The Run. One affected property owner noticed a surveyor working in Four Mile Run Field (The Run’s only community green space). Asked why he was so far from the bridge, the AWK employee said it was because they might need to widen the bridge.

Residents throughout The Run face harm from still more asphalt surfaces and permanent tree canopy loss upstream from their homes. Phase 1 of the MOC has already compromised the Pittsburgh Water and Sewer Authority’s stormwater project in the area because accommodating the shuttle road is a design requirement. The stormwater project enjoys nearly universal public support because it was sold as a solution to The Run’s chronic flooding problem. But building the half-mile road through Schenley Park would generate about 295,000 gallons of additional runoff.

DOMI calls the MOC a “mobility trail” to avoid admitting it is a road—and if the MOC can be called a trail, its shuttles can run on any trail. An additional leg of the “Swinburne Connection” extends into the UPMC shuttle lot toward Second Avenue, which also happens to link to the Eliza Furnace Trail, another crucial part of Pittsburgh’s car-free network.

The MOC is a reiteration of an old idea. And it continues to shamble forward, powered by $14 million from previous budget years. The “Swinburne Connection” reveals MOC planners deceiving residents yet again, feinting away from an “alternative” route they planned to use in addition to rather than instead of Schenley Park. Communities should not be asked—let alone forced—to sacrifice themselves for the sake of a development project that serves private interests.

Letter to PA Dept. of Environmental Protection and U.S. Army Corps of Engineers

image from permit application

Pennsylvania State DEP
Dana Drake, P.E.
dadrake@pa.gov
Phone: 412-442-4149 l Fax: 412-442-4242

U.S. Army Corps of Engineers
Mike Engelhardt
Michael.D.Engelhardt@usace.army.mil
Phone: 412-395-7141

Dear Ms. Drake and Mr. Engelhardt,

This open letter concerns the Pittsburgh Water and Sewer Authority (PWSA) permit application for the Four Mile Run Stormwater Project:

Pennsylvania State DEP ID: E0205220-031
U.S. Army Corps of Engineers Permit ID: CELRP-RG LRP-2018-774

As you know, Pittsburgh’s Department of Mobility and Infrastructure (DOMI) is attempting to get their developer-driven Mon-Oakland Mobility Project (also known as the Mon-Oakland Connector, or MOC) approved by the Pennsylvania Department of Environmental Protection (DEP) and the U.S. Army Corps of Engineers (USACE) by attaching it to the PWSA stormwater project.

These two projects do not belong together.

Junction Coalition joins numerous individuals, community organizations, and public representatives in calling for the PA DEP and USACE to send this permit application back to PWSA with direction to remove the DOMI project from the application before the permit is approved.

The PWSA stormwater project enjoys nearly universal public support because it was sold as a solution to The Run’s chronic flooding problem. Run residents have been asking for help to fix the flooding for more than a decade. They were told the city lacked funds as the problem worsened from combined effects of climate change and unregulated overdevelopment of surrounding higher-elevation areas.

A 2009 flood, which PWSA labels a 75-year event, caused catastrophic damage: Cars floated down the streets in 6+ feet of water and sewage, while residents watched 70+ inches of the mix breach the first floor of their homes. 

A 25-year flood event in 2016 gained citywide attention when dramatic footage showed firefighters rescuing a resident and his son from the roof of their car. Later that year, Mayor Bill Peduto tasked PWSA with finding funds and developing a plan to fix the flooding.

A city-mandated 2017 survey of Run residents recorded unanimous demand for flood relief and a large majority of residents adamantly opposing the MOC.

The MOC is a road through a public park that debuted to Run residents in a 2015 Pittsburgh Post-Gazette article reporting the project as a done deal. It is a huge investment of taxpayer dollars in a private development plan that studies show does not meet Pittsburgh’s stated goals. Even DOMI director Karina Ricks admits that the MOC is not a transportation solution.

Instead of responding to residents’ legitimate concerns about the MOC, public employees twisted those concerns to seem like a baseless fear of progress. They tried to pit neighboring communities against each other. They filed fraudulent grant applications and applied for new grants without telling the public. They used public meetings for time-share marketing tactics rather than honest discussion, pretending to consider alternative routes for the shuttles before again settling on Schenley Park. They responded to Right-to-Know requests with claims of attorney-client privilege and a 7,185-page unsearchable PDF. They obscured and constantly changed details such as the route. And recently, several Run residents who live near one of the rejected alternative routes received letters from DOMI implying they may lose their homes and businesses through eminent domain.

These are not the actions of people with good intentions. If the MOC benefited those who live in the communities it affects, Mayor Peduto’s administration would not need to resort to duplicity and steamrolling. Furthermore, if Hazelwood Green’s powerful owners had no desire to annex Schenley Park and adjoining neighborhoods, they would drop their single-minded focus on getting shovels in the ground as soon as possible and instead support alternative plans such as Our Money, Our Solutions that offer more effective transportation for more people without causing the harms of MOC. 

Evidence shows that PWSA’s stormwater plan fails to prioritize the severe flooding issue and was designed to accommodate the MOC project. In their current 10-year flood event design, PWSA is following behind-closed-doors directions from Mayor Bill Peduto’s office. From their budget of $40 million, PWSA listed their flood mitigation efforts at $14 million. Asked where the remaining $26 million would be spent, PWSA responded via email, “The remaining funding can go towards future projects in the upper portions of the watershed” and “provide opportunities to collaborate with the universities.” All PWSA Board members are nominated by Mayor Peduto, a longtime MOC proponent. PWSA’s plan includes several wish-list items of the Pittsburgh Parks Conservancy, a private entity on whose Board of Directors Mayor Peduto sits.

Expert consultants who have analyzed the current PWSA stormwater plan tell residents:

  • The proposed Mon-Oakland Connector project would most likely harm flood control—with an approximately 1/2-mile long (39,600 sq ft) impervious surface that eliminates 7 acres of old-growth tree canopy from Schenley Park. That amount of paving would generate about 295,000 gallons of runoff. Every acre of impervious surface generates 27,000 gallons of runoff for each inch of rain and Pittsburgh has seen a range from around 36-60 inches of rain over the last 10 years. PWSA has not proven that including the MOC will not harm flood control and has refused repeated requests for all engineering plans/documents of the PWSA stormwater project for independent analysis.
  • PWSA concentrates the stormwater work in the Schenley Park/Oakland end of the watershed, which would address only 1/3 of flooding in The Run. The rest comes from the opposite end of the watershed—the Squirrel Hill/Greenfield/376 Parkway end. Although it only accounts for 1/3 of the cause of flooding, the water/sewage mix from 5,200 structures above Panther Hollow Lake in Schenley Park feed into a 50-inch pipe that completely bypasses the Panther Hollow/Junction Hollow area of the watershed and feeds directly into The Run. PWSA’s plan does not address this specific connection and its effects on the neighborhood. 
  • PWSA’s plan would level approximately 7 acres of tree canopy to make room for the MOC project (beginning with 900 trees in the northern end), which will never be replaced in the space the roadway would commandeer. Furthermore, replacement saplings will not equal the water absorption of 7 acres of mature trees.
  • PWSA’s 10-year event plan “makes no sense”—unless it involves changing the floodplain and eliminating properties. RTK-obtained notes from a Mayor’s office meeting show PWSA Chief of Program Management Alex Sciulli stating, “More cost-effective options may be to change the floodplain and purchase the affected properties.” The “cost-effective” plan makes sense only within a larger plan to raze the neighborhood, forcing out residents and demolishing structures instead of the promised flood mitigation.

Flooding in The Run is a serious health and safety issue that cannot be ignored to serve developers’ financial interests. Therefore:

  • The dual permit application from PWSA and DOMI to the PA DEP and USACE must be denied, and PWSA must be directed to fully separate the two projects. 
  • The PWSA plan must prioritize the flooding issue instead of merely providing cover for an unwanted, unnecessary road that will permanently degrade Schenley Park and eventually erase two historic Pittsburgh neighborhoods.
  • PWSA must present a plan acceptable to residents whose lives and properties are at risk. Such a plan would include:
    • Documentation of studies done to assess the impact of MOC on the PWSA stormwater plan.
    • An Environmental Impact Study on the overall stormwater plan.
    • A Community Benefits Agreement guaranteeing compensation to residents who suffer damage from future flooding, as many residents currently cannot acquire flood insurance.

We are disappointed in your timing of the public comment period on this joint permit application to coincide with the holiday season. We hope you will give this important matter the time and impartial consideration it deserves.

Sincerely,  

 Junction Coalition

Pittsburghers Speak Out Against Shuttle Road

As promised, we are gathering statements from DOMI’s public meeting concerning the proposed road through Schenley Park. Below you’ll find quotes from residents of affected communities, activists, transit advocates, university students, and others—along with links to their full statements. We’ve also included those who didn’t get a chance to speak or could not attend the meeting. If you fall into any of these categories and would like us to publish your statement here, please email junctioncoalition@gmail.com.


“As a campus spiritual advisor I often talk with students about their responsibility as members of an institution that wields considerable power and influence over the neighbors who make their homes here. That they should amplify the voices of neighbors whose opinions and needs have sometimes been cast aside for the sake of development.

And in this case I have yet to hear from any Hazelwood, Greenfield, or Oakland residents who are demanding a private shuttle between Oakland and Hazelwood Green. What I do hear loudly from my neighbors is a need for increased bus service.”
Mike Holohan, The Run
Read more »

“No matter what you would offer in money for my business, it wouldn’t be enough to start over somewhere else.” —Dana Provenzano, Zano’s Pub
Read more »

“Who’s going to really benefit if the capacity is 1,000 riders a day—if that’s the ultimate capacity and you’re going to displace 20,000 cars a day? The math does not figure…When I say this, I say this as an 81-year resident of Hazelwood. I get calls every day from gentrifiers who want to buy my property.”
Homer Craig, Hazelwood
Read more »

“During this fight, we have won some major improvements to the City’s original plan. These include a flood mitigation project in Four Mile Run, park enhancements, and bike and pedestrian improvements—none of which were part of the original concept. We also won weekend service on the 93 bus starting next month—connecting residents of Hazelwood and Greenfield to Oakland, Squirrel Hill, Bloomfield, and Lawrenceville—actually improving mobility for our communities while the City and DOMI have done nothing but waste millions in consulting and design fees.” —Barb Warwick, The Run
Read more »

“Our city is facing a massive budget shortfall and unless you live in Donald Trump’s fantasy world, you know it’s likely to get worse. But despite the clear need to redirect a vastly reduced budget to human needs, my city insists on spending almost $20 million on a boondoggle that no community favors.”
Mel Packer, Point Breeze
Read more »

“The project does not benefit the people who live here and is a blatant attempt to destroy our community and give the land to universities and developers.” —Susan Cohen, The Run
Read more »

“If I’m wrong and this is a mass transportation project, well, you guys should fund the Our Money, Our Solutions plan instead because it does everything that this could hope to accomplish—better, faster, cheaper and without any of the associated harms.” —Laura Chu Wiens, Pittsburghers for Public Transit
Read more »

“Every justification put forth for building the road has been proven false. Proponents are now at a loss for any argument other than, ‘We have to build it because we’ve been secretly planning this for years!'”
Ray Gerard, Lower Greenfield
Read more »

“The City recognizes the seriousness of Climate Change, does not dispute the science behind these issues, yet continues to adhere to the model of development that is driving these issues. The Climate Action Plan states unequivocally, ‘HALT the conversion of forest canopy to development’ and such a conversion is exactly what is being proposed here.”
Matt Peters, Hazelwood
Read more »

“These are not the actions of people with good intentions. If the MOC benefited those who live in the communities it affects, Mayor Peduto’s administration would not need to resort to duplicity and steamrolling.”
Ziggy Edwards, The Run
Read more »

Who Is Bending PWSA Backward to Accommodate the Mon-Oakland Connector?

The answer may not surprise you

Per usual, a number of disturbing revelations floated to the surface at PWSA’s September 15 public meeting about the Four Mile Run Stormwater Improvement project. Highlights include:

  • The plan calls for removing 900 trees from the Junction Hollow/Panther Hollow section of Schenley Park, according to Tim Nuttle of Civil & Environmental Consultants (CEC). Most of the trees slated for removal, Mr. Nuttle said, are located at the north end of Schenley Park in the Panther Hollow neighborhood. Presumably, this total does not include trees that would be cut down by the controversial Mon-Oakland Connector (MOC) road through Schenley Park.
  • Part of the project attempts to address the large amounts of runoff from the Parkway East overpass that cuts through The Run, but despite talks between PWSA and PennDOT there is currently no plan for PennDOT to share any of the costs.
  • The MOC and the foot path have both been moved since the previous PWSA meeting on June 18 of this year. PWSA representatives said they heard that people didn’t want the walking trail right next to the MOC, which is designed to accommodate motorized shuttles between Hazelwood Green and the university campuses in Oakland. The foot path, in the latest PWSA presentation, has been moved to the other side of the soccer field. The MOC has also changed course, but in the presentation a photo covered a critical turn in its path. Before reaching the southern entrance to Schenley Park, where they diverge at the soccer field, the two paths are still side by side. Twitter user @Bram_R recalled, “When [residents] asked about the safety of that, were told there’d be ‘a piece of wood or something’ separating [the MOC and foot path].”
  • PWSA has spent months telling concerned residents that no model of the Four Mile Run Stormwater Improvement project exists that excludes the MOC. But during this most recent meeting, PWSA representatives divulged that such a model does exist. According to this new narrative, the MOC was added to the stormwater models after initial public meetings where residents expressed concerns about how a new asphalt road (and associated removal of trees) would affect the project’s ability to address the flooding issue in The Run.

    MOC opponents contend that the MOC—a development project designed to lure corporations to Hazelwood Green—should not take precedence over the stormwater project. The core project in Schenley Park has long been considered “technically challenging” even without incorporating a new road.

    PWSA continues to withhold the MOC-free model from residents, and did not use it in their chart where they showed a net benefit in flood control. The presentation implied that this positive result is because of MOC, rather than despite MOC. Without an MOC-free model, the road’s true impact on flood control cannot be measured.
  • Discussion of “BMPs” (best management practices) revealed that the BMPs in question were “swales,” or ditches, to hold runoff from the MOC road. These deep ditches are placed directly next to the youth soccer field.
  • After the June PWSA board meeting, PWSA executive director Will Pickering responded to resident concerns over undue influence over PWSA by Mayor William Peduto and the private interests that define his administration’s agenda. A resident had stated that all except one board member were nominated directly by Mayor Peduto. Mr. Pickering clarified via email, “Ms. [Margaret] Lanier’s initial term on the PWSA Board was prior to Mayor Peduto’s term(s) as Mayor, but all appointments to the PWSA board are nominated by the Mayor and approved by Council. Ms. Lanier’s most recent nomination was indeed put forward by Mayor Peduto.”

    At the September stormwater project meeting, PWSA Chief of Program Management Alex Sciulli elaborated that a committee formed by Mayor Peduto chose the latest round of PWSA board nominations. According to the Pittsburgh Post-Gazette, the committee is “chaired by Mark Nordenberg, University of Pittsburgh chancellor emeritus and chair of the Institute of Politics. The other members…include Community College of Allegheny County President Quintin Bullock, former Regional Asset District Executive Director David Donahoe, Women for a Healthy Environment Executive Director Michelle Naccarati-Chapkis and Heinz Endowments President Grant Oliphant.”

    The Heinz Endowments is one of three foundations that comprise Almono Limited Partnership, which owns the vast majority of the Hazelwood Green site—the development of which MOC is intended to bolster.

    Mayor Peduto, a longtime proponent of MOC, faces an estimated $100 million budget shortfall this year because of COVID-19. The City’s capital budget includes $23 million for MOC over the next few years—$9 million for 2021 alone. Approximately $2 million has already been spent on “community outreach”—marketing efforts to convince residents of affected communities they should abandon efforts to stop the road from being built.

    Mayor Peduto’s chief of staff, Dan Gilman, tweeted on September 15: “Today, City Council approved the Mayor’s 3 appointees to the @pgh2o board. These three women – BJ Leber, Rosamaria Cristello, and Dr. Audrey Murrell are going to be tremendous leaders in helping PWSA continue to modernize and provide a safe and reliable water system.”

    When @Bram_R commented that “it’s going around that these 3 new board members came off a list given to the Mayor by Pitt & CMU, and that they’re ‘their’ appointees. W Almono nearby as well, [residents] have a lot of concerns that their neighborhood is being slated for gentrification,” Mr. Gilman responded, “This is completely untrue. The names came from suggestions by the PWSA Board Nominating Committee that was publicly announced and part of the recommendations from the Blue Ribbon Panel.”

    The panel Mr. Gilman mentioned includes Jared Cohon, former president of Carnegie Mellon University (CMU).

    Twitter user @BarbWarwick2 replied to Mr. Gilman with background on the three new board members: “Looks like Ms. Cristello works at CMU and Dr. Murrell at Pitt. Ms. Leber is CEO at adagio health, which is associated with UPMC. All very accomplished women indeed, but the ‘eds and meds’ comment is not wrong. PWSA board could use at least one or two resident advocates, no?”

Asked why the PWSA’s June presentation accounted for only $14 million of the $40 million project budget, PWSA acting senior manager of public affairs Rebecca Zito responded in an email, “The remaining funding can go towards future projects in the upper portions of the watershed, provide opportunities to collaborate with the universities and other community organizations on future stormwater projects, or revisit some of the original green infrastructure projects planned for Panther Hollow Stream and Phipps Run.” (emphasis added)

After decades of steadily worsening floods in The Run and avowals from city officials that they lacked funds to fix it, residents have every right to demand that the $40 million secured for the Four Mile Run Stormwater Improvement project addresses their dire public safety need rather than accommodating a project to benefit The Heinz Endowments, the University of Pittsburgh, CMU, and a handful of other private entities. Yet these very entities have been tasked with overseeing the PWSA and its execution of the Four Mile Run Stormwater Improvement project.

You can view the PWSA’s June 18 presentation on their website, and PWSA has promised to post a recording of the September 15 meeting and accompanying presentation soon.

Run Residents to PWSA Board: Create Model for Stormwater Plan Without MOC

On March 27, 2020, the Board of the Pittsburgh Water and Sewer Authority (PWSA) convened its monthly board meeting via telephone conference line. The Board received comments from several residents of The Run, the neighborhood most directly affected by the PWSA’s 4-Mile Run Stormwater Improvement Plan. They asked the Board to create a model for the project that excludes the controversial Mon-Oakland Connector (MOC) road through Schenley Park.

PWSA Chief of Program Management Alex Scuilli has stated on the record that no such models currently exist. MOC opponents have long contended that the MOC—a development project designed to lure corporations to Hazelwood Green—should not take precedence over the stormwater project, which addresses severe flooding in The Run as well as an EPA mandate to separate stormwater from sewage.

Despite its importance to public safety, the stormwater project is not expected to fix the flooding but only lessen it. Right-to-Know documents show Pittsburgh mayor Bill Peduto’s chief of staff Dan Gilman admonishing the PWSA to “improve the messaging on this issue” to adjust residents’ expectations. The vast majority of runoff that floods The Run comes from Greenfield—not Schenley Park, where funding for the stormwater project has been directed. Yet the project was originally pitched to residents as a way to address the flooding issue. The “messaging” changed in early 2019—well into the engineering process. The core project in Schenley Park has long been considered “technically challenging” even without incorporating a new road.

It seems likely the $41 million stormwater project could be more effective if it weren’t required to accommodate the MOC. Multiple experts have told residents of affected neighborhoods that the MOC could hinder flood control. Recently, Pittsburghers for Public Transit worked with analysts to complete a cost-benefit study of expanded public transit versus MOC shuttles in affected neighborhoods—but some costs of the MOC fall outside the scope of that study, including harm to the stormwater project’s effectiveness and to Schenley Park itself. These costs must be examined at least as carefully as the costs of inefficient shuttle service.

There is a clear public need for the PWSA’s stormwater project, and a clear lack of need for the MOC. The MOC benefits developers, not residents, and exemplifies the “non-essential construction” Governor Wolf has halted during the COVID-19 crisis. It is more prudent than ever to develop alternative plans.

Contact the PWSA

412-255-2423
www.pgh2o.com/report-an-issue

DOMI Director Karina Ricks Responds

On October 26, 2019, Junction Coalition received a response from DOMI director Karina Ricks to our open letter. In our letter, we asked questions compiled from residents of The Run—one of the neighborhoods in the path of the proposed Mon-Oakland Connector. After introductory comments, Ms. Ricks responded to the questions one by one. Below is the full, unaltered text we received. We formatted the response section with Ms. Ricks’ responses below each original question, along with our reply to each response.

Dear Junction Coalition,

Thank you for your message and providing an opportunity to respond and provide greater clarity around the Mon-Oakland and Four Mile Run project.

First of all, safety and health are the overarching concerns of this and any Administration. Project partners including the URA, Pittsburgh Parks Conservancy, PWSA and multiple City Departments have been working for years to effectively address the stormwater issues that impact the Four Mile Run portion of Greenfield.

Concurrently, economic regeneration in Pittsburgh is also a goal in order to both provide economic opportunity to our residents and put the City back on solid financial footing in order to have the resources to meet our many critical needs and public services. The Administration is committed to ensuring that this regeneration is forward-looking, promoting transit-oriented development and other sustainable mobility choices and avoiding the auto orientation and associated impacts of the past generation.

The Mon-Oakland/Four Mile Run project does both – it addresses the critical and threatening stormwater impacts and provides an opportunity for sustainable development and job growth in a community that very much needs both. 

The attachment you sent – a URA grant application – emphasizes the stormwater project, seeking additional resources for design of stormwater mitigations, while concurrently recognizing the need for improved mobility and access. There is nothing in the grant to indicate that stormwater solutions are precluded by or subordinated to improved mobility. Clearly, both can be achieved.

1. We’ve been told that the watershed project and the roadway project are separate yet being done “in tandem.” That level of coordination requires detailed plans. When will you share full details so that resident-approved independent experts can evaluate them before construction begins?

    • K. Ricks response: The City will share 30% design drawings for the mobility path and park amenities when complete. The anticipated timeline is 30% drawings by the end of the year, 60% drawings by the end of February and a complete bid package by spring.

       

    • Junction Coalition reply: We look forward to seeing the materials you promised by the end of the year and will follow up. But design drawings are insufficient for any substantial evaluation. We have requested and continue to await the following:
      • All up-to-date and current plans for the proposed road
      • A drawing index plan of the overall Junction Hollow construction areas in Schenley Park
      • Proposed plan drawings, engineering sections, and profiles of changes to Junction Hollow’s existing landscape

2. At the January 2018 public meeting, Michael Baker Corporation presented 6 possible routes (including 5 offered by residents). [DOMI director Karina Ricks] expressed a preference for the Swinburne route but said it was not viable because of the landslides on Swinburne. Why is Swinburne unviable for smaller lighter AVs, yet currently open to at-times bumper-to-bumper traffic including cars, trucks, UPMC shuttles, emergency vehicles, and school buses?

    • K. Ricks response: The mobility path is to be an exclusive pathway suitable for both light shuttles and other e-powered vehicles such as e-bikes and, when categorized, e-scooters and other such vehicles as may evolve over time. There is insufficient width on Swineburn to provided this dedicated path. The street cannot be widened due to the fragile soil conditions.

       

    • Junction Coalition reply: This answer only supports the need for our original question—and begs additional questions:
      • How is it possible that these “light shuttles” and smaller vehicles named such as bikes and scooters require more width than the large vehicles such as school buses and UPMC shuttles that currently traverse Swinburne?
      • Just how much width is needed for the proposed roadway and how can it be called a “trail” if it needs to be wider than a two-lane road for full-sized vehicles? In the maps you most recently presented at the Nov. 21 public meeting, the mobility road is marked as 15 feet wide. The narrowest part of Swinburne is an average of 19.8 feet wide.
      • At the meeting, you mentioned vehicles that are 11 feet long and 6 feet wide. Two such vehicles could not pass each other on a 15-foot wide road while accommodating cyclists. Is DOMI considering widening the MOC road in the future?

3. The newest map shows the proposed roadway running right along the bottom of Swinburne, which has experienced landslides in the past and present, and which DOMI designated “unviable” as a route. What is the true reason you are so attached to the route through Schenley Park? Why do the private partners want this land so badly?

    • K. Ricks response: There is an existing pathway through Junction Hollow at present. There is a former roadway (Boundary Street) and a current active freight rail line. This is a current and historic transportation/mobility corridor. The Mon-Oakland project is in keeping with this historic role.

       

    • Junction Coalition reply: This response does not answer the original question. Don’t the Swinburne landslides have to be addressed in order to put a new road directly beneath the hillside as well as maintain the existing road on the hill? Regarding the history of Junction Hollow, the “former roadway” you mention was a poorly maintained dirt road. It was wiped out by, of all things, a landslide more than 30 years ago. That’s when the City closed it to traffic. The “current active freight rail line”—with trains carrying unidentified cargo (likely volatile fracking chemicals)—poses serious issues for the surrounding areas: not only our neighborhood but also the high-density residential housing in Oakland the rail line passes directly under. We should not add new potential hazards to the mix.

4. According to sources, there is a discussion happening behind the scenes about trying to buy out residents who live along Four Mile Run/Boundary streets—whose basements always flood when there is heavy rain. Is it true that you are going to attempt to buy or force those folks out through those or other means?

    • K. Ricks response: There are no plans at present to buy residential properties in The Run. There are no plans to force residents out of their homes.

       

    • Junction Coalition reply: “At present” is not a reassuring qualifier. At a 2/22/19 Mayor’s office meeting you attended, Alex Sciulli of PWSA “indicated people are going to expect with the project dollars spent that they won’t have flooding. [He] noted more cost-effective options may be to change the floodplain and purchase the affected properties.” (Quote sourced from meeting notes attained via Right-to-Know request to PWSA)

5. In 2015, public officials stated to the press that the city would go to court to overturn Mary Schenley’s deed in order to seize the publicly owned and protected property of Schenley Park. Are you still planning on going to court to force that outcome?

    • K. Ricks response: The property along Junction Hollow is a portion of Schenley Park. There are park roads and pathways throughout Schenley Park. There is no need to go to court for the proposed facility.

       

    • Junction Coalition reply: Regarding your statement that “there are park roads and pathways throughout Schenley Park,”  existing features do not justify creating a new road in an important established bike and pedestrian corridor. The Junction Hollow trail is part of the only connection between Oakland, Greenfield, Hazelwood, the South Side, and Downtown that does not require users to share a road with motorized vehicles. Moreover, the proposed road is specifically for privately operated vehicles, which goes against Mary Schenley’s original intent for the park as stated in her deed.

6. At the September 2018 meeting, PWSA head Robert Weimar stated, “We only have one chance to get this right” regarding the storm-water plan’s success. We agree, and expect access to detailed plans so that an independent, resident-approved expert can evaluate them before construction begins. When will you provide those plans?

    • K. Ricks response: Please direct requests for the stormwater design plans to PWSA.

       

    • Junction Coalition reply: At the City’s suggestion in response to our first Right-to-Know request, we directed these requests to PWSA via additional RTKs. PWSA gave us materials that seem to conflict with what DOMI has provided in its most recent public materials. Neither DOMI nor PWSA has given us current, adequately detailed plans for analysis.

7. Will you provide a list of all “project partners” with their contact information—email addresses and phone numbers?

    • K. Ricks response: The project partners are: Pittsburgh Water and Sewer Authority led by Robert Weimar (rweimar@pgh2o.org), Department of Mobility and Infrastructure led by myself, Department of Public Works led by Mike Gable (mike.gable@pittsburghpa.gov). The Pittsburgh Parks Conservancy serves as a project advisor having completed the Four Mile Run Conceptual Design Plan. PPC is led by Jayne Miller. The URA and Department of City Planning are occasionally consulting parties to the project as is Hazelwood Green represented by Rebecca Flora.

       

    • Junction Coalition reply: Thank you for providing this list, but the absence of private entities in your list leads to further questions. Does this mean University of Pittsburgh and Carnegie Mellon University, the private partners named in the URA’s 2015 grant application (ID 2015073111048) are no longer involved in the project? Was the public-private partnership referenced in the grant application formally dissolved?

      If so, and if the Mon-Oakland Connector/Mon-Oakland Mobility Project is a different project, then why does it have the same goals as the Oakland Transit Connector referenced in the 2015 grant application—and why do various private entities continue to act as stakeholders in meetings throughout the process while the public is invited to participate only in reviewing already-decided plans?

8. Multiple experts have told residents that forcing the roadway onto the watershed plan will compromise flood control. A URA document titled “Project Narrative for Heinz Endowment” states, “Measure of success: We will produce several construction alternatives … and couple them with the potential design options that will not preclude any major transportation options under discussion.” In plainer language, this paragraph says that a successful flood control plan won’t interfere with the proposed roadway—in other words, the road takes precedence. This directly contradicts repeated public statements made by you [K Ricks], PWSA, and other officials. Given the true priorities behind both projects, what guarantees can residents expect regarding the success of the watershed improvement plan? When will a community benefits agreement with those guarantees be enacted?

    • K. Ricks response: The narrative above clarifies the misinterpretation that an effective stormwater solution is precluded by a supplemental pathway. [Following is the narrative we believe Ms. Ricks references here.]

      The Mon-Oakland/Four Mile Run project does both – it addresses the critical and threatening stormwater impacts and provides an opportunity for sustainable development and job growth in a community that very much needs both.

      The attachment you sent – a URA grant application – emphasizes the stormwater project, seeking additional resources for design of stormwater mitigations, while concurrently recognizing the need for improved mobility and access. There is nothing in the grant to indicate that stormwater solutions are precluded by or subordinated to improved mobility. Clearly, both can be achieved.

    • Junction Coalition reply: Actually, it doesn’t seem clear at all. We have included relevant text below and you can reference the complete document.

      Goal 3: We will create a feasible design for the area encompassing the southern area of Schenley Park to the Monongahela River. This particular design question is one of the more important and most technically challenging, and has the potential to provide the most impact to the overall question of whether a design that can truly integrate ecological/compliance goals and transportation connections is possible. It necessitates answering the question of whether a separate storm sewer from the southern end of the park to the river is feasible. But there is an extremely high amount of both above and below grade infrastructure– not to mention a high interest and need in creating multi-modal transportation connections– that requires a specialized approach to daylighting in this area (trenchless). Measure of success: We will produce several construction alternatives (such as horizontal directional boring, micro tunneling, etc.) and couple them with the potential design options that will not preclude any major transportation options under discussion.

      To summarize, the project is “technically challenging” even without “a high interest and need in creating multi-modal transportation connections.” There is an overall question of whether “a design that can truly integrate ecological/compliance goals and transportation connections is possible.” But the success of the project will be measured by how well “construction alternatives” can be “couple[d]” with “the potential design options that will not preclude any major transportation options under discussion.”

      The summary we provided here uses the actual language of the document and directly conflicts with the “narrative” you provided.

      Your response also does not answer the questions we asked: What guarantees can residents expect regarding the success of the watershed improvement plan? When will a community benefits agreement with those guarantees be enacted?

9. How was it determined that the route through two neighborhoods and Schenley Park is the only viable route? Swinburne would have to be stabilized to prevent it from collapsing onto the proposed roadway. So why spend an additional tens of millions of dollars to build a new road instead of using Swinburne as the route?

    • K. Ricks response: The response to question 2 should also answer this inquiry. Widening Swinburne Road is not feasible.

    • Junction Coalition reply: This response does not answer the original question. It only brings up more questions, as detailed in our question 2 reply.

      Moreover, your statement that “widening Swinburne is not feasible” does not make sense as the reason an existing road cannot serve as an alternative to a new road in Schenley Park. As detailed in our question 2 reply, the maps you most recently presented show the mobility road marked as 15 feet wide. According to your statements at the most recent public meeting on 11/26, this width necessitates shuttles pulling over to let another oncoming shuttle pass. The road is billed as accommodating commuter cyclists, yet it forces them into extremely close contact with motorized vehicles that frequently need to pull over. Swinburne St. is 19.8 feet wide on average at its narrowest point. It would seem that Swinburne is already significantly wider than the proposed road even at its narrowest, and therefore would not need to be widened.

      In any case, “fragile soil conditions” on Swinburne endanger the proposed roadway as much as they endanger the existing street.

10. On April 18, some residents of The Run, along with Pittsburghers for Public Transit and the Penn Plaza Support and Action Coalition, sent Mayor Peduto an open letter. We made specific, actionable demands to actually include the public in this so-called public process concerning the Mon-Oakland Connector—things like announcing the meetings at least 14 days in advance, revealing the total amount of public funds spent so far, and formatting the meetings so that all attendees can hear all the questions and answers. When will we receive a formal response, and why are you continuing to take up most of these meetings with presentations and breakout sessions?

    • K. Ricks response: Meetings have been and will be announced at least 14 days in advance. Meetings have been structured to provide time for people to engage in the means and methods most comfortable and accessible to them. This includes presentations with opportunities for written comments and feedback, whole group “plenary” discussion, small group breakouts, online information and feedback and occasionally field visits/tours and meetings with individual neighborhood organizations. While we recognize the preferred engagement method proposed by the Coalition, we also recognize that diverse individuals engage in a diversity of ways thus we will continue to provide engagement in multiple ways rather than the one means prescribed in your letter.

    • Junction Coalition reply: Have you specifically asked for feedback about engagement methods? If so, how was this accomplished and do you have records of the results? How much preference did you receive in the feedback specifically for “small group breakouts?”

11. By choosing AV, you are eliminating jobs, thus reducing the tax base. How will the City make up for this loss of revenue and pay for basic services like roads, bridges, infrastructure, etc.? Will robots pay taxes?

    • K. Ricks response: The Mon-Oakland Connector is a trail, not an operational service. The trail is being designed to accommodate use by microtransit. This service may one day be provided via self driving vehicles however at this point in time no truly self driving technology exists thus anyvehicles will have a human operator. There is a much larger policy discussion locally and nationally that is necessary around transportation funding (the current mechanism – the gas tax – is insufficient to support infrastructure maintenance and improvement, and gas tax revenues are projected to decline with greater fuel efficiency and electrification of the fleet). The future of work for the rising generation of workers is also a critical discussion. Fortunately full autonomy is still decades away and there is adequate time to prepare for a non-disruptive transition that preserves the ability for our workers to make a livable wage through dignified, rewarding work.

    • Junction Coalition reply: So the road is being built for microtransit in general, not specifically for self-driving or automated vehicles? Regarding microtransit as a solution, we invite you to read this post from public transit consultant Jarrett Walker if you have not already done so. Why are we spending tens of millions of taxpayer dollars to build a road for privately operated microtransit that by its very nature serves a small group of people?

      Your point that “any vehicles will have a human operator” because “full autonomy is decades away” means the service would essentially consist of a fleet of minivans (8,000 pounds, 11 feet long, 6 feet wide). Human operators can drive at higher speeds than 15 mph and they can travel on existing roads with other minivans. In other words, a foreseeable future of human shuttle operators undermines the rationale for an isolated corridor to accommodate a microtransit service. Even driven at normal speeds, the route through the park does not offer the dramatic shortcut originally proffered in 2015. Officials claimed commute times from Hazelwood to Oakland of 30-40 minutes, but this was based solely on rush-hour traffic. Residents stopwatch-tested the claim by driving existing routes at various times. The Second Ave.-Bates St. corridor from Hazelwood to the main campuses in Oakland took 12-14 minutes. Various existing routes from the intersection of Greenfield Ave and Saline and Irvine streets took 3-4 minutes to Hillman Library in Oakland.

      Moreover, if “no truly self driving technology exists” and automated shuttles are a far-off eventuality, please explain why Pittsburgh worked to secure the Knight Foundation grant and why you are so eager to use it to bring autonomous vehicles to events where Pittsburghers can “kick the tires” as you said. Not to mention that Uber and others are already using Pittsburgh streets as a test track for their autonomous vehicles.

      Your position in this response seems designed to have it both ways: The road must be built now for a far-off technology, and since DOMI is only building a road the service can be whatever is convenient at any given time to bolster an argument for building the road.

12. The Planning Commission approved a last-minute tripling of residential density in the Hazelwood Green plan over objections by the Greenfield Community Association and the Run Resident Action Team. Karina Ricks admitted in 2017 that if Amazon accepted Pittsburgh’s bid, the Mon-Oakland Connector would be inadequate for the increased number of users. Why are you investing public money into a roadway that is already obsolete before it’s even built?

    • K. Ricks response: Additional trail capacity will never be obsolete. The City of Pittsburgh is hopeful to regain a substantial portion of the near 700,000 residents we once had (current city population is 305,000). We cannot support this regeneration if our restored residents drive at rates common among our existing regional residents. We must promote and encourage a greater share of trips being accomplished via walking, transit, bicycle, micromobility and higher occupancy vehicles like microtransit. If we are successful in accomplishing our goal of >50% of household trips being accomplished by non-auto and active transportation means we are going to need substantially more capacity for these modes throughout our city including along theJunction Hollow Trail corridor. Furthermore, we know that the best opportunity to form lasting travel habits is when a person moves to a new residence or new job location. Doing this means we need to make their initial experience easy, dignified, and maybe even fun. If we can “train” new workers and residents to take that initial ride even on the low speed, smaller capacity microtransit, we can convince the of the “proof of concept” that transit generally is a viable mode for everyday trips and we can create a life-long a low-drive resident or worker. High capacity mass transit will always be the long term goal. Microtransit, however, can be the way to attract more riders to our region wide system.

    • Junction Coalition reply: Why do we so desperately need to increase the tax base by doubling our current population? Why not instead tax the corporations masquerading as non-profits? Public servants should not allow their constituents to be held hostage by powerful private interests. Furthermore, the utility of microtransit in benefiting the general population or attracting new residents is dubious.

13. Isn’t it a conflict of interest that some of the people involved in decision making about the roadway and storm-water projects stand to profit from developing Hazelwood Green?

    • K. Ricks response: Please see response to question 7 and further clarify.


    • Junction Coalition reply: Please refer to our reply to the same question. Again, the names you provided do not reflect the public-private partnership that originally filed a grant application for this project in 2015. Was this PPP formally dissolved? If this is truly a different project from the 2015 project, why does it have the same goals?

14. We have the agenda from a 2000 “community outreach project” meeting titled “The New Junction Hollow Vision.” The agenda advocates for a short, intense “charette” process—that means a meeting of all stakeholders where conflicts are worked out. But the meeting involved only residents of Oakland and the Oakland Community Council. Hazelwood Initiative is mentioned but not Panther Hollow or The Run—the neighborhoods that are actually located in Junction Hollow, the communities that would be affected most. Do the Oakland organizers of this meeting still think Junction Hollow belongs to them, and that they can decide its future? Why would they not include the communities of Panther Hollow and The Run?

    • K. Ricks response: The document and meeting referenced are now nearly 20 years old and no longer being used as the basis of the current public engagement process.


    • Junction Coalition reply: This answer willfully misses the point of the question. This roadway was being discussed 20 years ago and the directly affected communities were excluded. The 2015 grant application (before your involvement) violated the PA Sunshine Act. In other words, this project has a long history of secrecy and questionable conduct. More recently, new grant applications went unmentioned in all the public meetings that occurred as the applications were being prepared and filed. This is just one example of a sustained focus on the appearance of transparency at the expense of transparency itself. The “current public engagement process” does not seem to have changed all that much in 20+ years. Why have the communities of Panther Hollow and The Run been excluded for so long?

15. A URA document titled “Exhibit 1” states, “The implementation of the Oakland Transit Connector model can address a majority of these barriers and will open the opportunities for continued economic growth across Oakland and into adjoining communities.” The barriers: People already live here. There’s a public park here. Development can only address these “barriers” by eliminating them. No one consulted those “adjoining communities” about the Mon-Oakland Connector before deciding to proceed with it. And during the series of public meetings last year, DOMI filed another grant application connected to the roadway without telling residents. City officials have lamented the continuing distrust around this project, but how can they be surprised?

    • K. Ricks response: Question is rhetorical

    • Junction Coalition reply: The question is far from rhetorical to communities that face extinction as a result of decisions that are being made without their input—and further, to the detriment of their safety and quality of life.

16. Some people would like to attend these meetings but can’t because they are taking care of kids. Will you use part of the Knight Foundation grant to facilitate their participation by providing kids’ activities and supervision for future meetings?

    • K. Ricks response: That is a great suggestion. We will see if that can work. If there is a member of the Coalition that would serve as a sounding board on a structure, time and activities that would be most conducive to this type of engagement, that would be wonderful.

    • Junction Coalition reply: Barb Warwick has volunteered to act in this role. Please let us know if you do not have her direct contact information and we will provide it to you.

17. DOMI’s presentation for the February 2018 meeting included a chart that gave “Autonomous Microtransit” a higher positive ranking than conventional shuttle buses and improved Port Authority bus service. This despite the fact that no data supports the assertion that AVs have a greater ability to “deliver in the near term” or “promote sustainable mobility and development”—in fact, the proposed Mon-Oakland Connector requires completely new infrastructure and a new fleet of vehicles. Why is AV being so aggressively put forward as the solution and whose interests does this serve?

    • K. Ricks response: Please see response to question 11.
    • Junction Coalition reply: It is convenient to get around these questions by stating that you are only making decisions about the road itself—but if you have no idea what you are going to put on the road, how is that a transit solution?

18. Will people be able to use the Mon-Oakland Connector if they don’t have a smartphone or don’t want to provide personal information? What happens to the personal information a Mon-Oakland Connector app would collect?

    • K. Ricks response: 18 and 19. Please see answer to question 11. When a service is proposed to operate on the trail these questions will need to be publically answered before a permit for operation will be granted.

       

    • Junction Coalition reply: It is convenient to get around these questions by stating that you are only making decisions about the road itself—but if you have no idea what you are going to put on the road, how is that a transit solution?

19. What will happen to the Mon-Oakland Connector fare system after the fares are no longer subsidized (after 2 years)?

    • K. Ricks response: 18 and 19. Please see answer to question 11. When a service is proposed to operate on the trail these questions will need to be publically answered before a permit for operation will be granted.

       

    • Junction Coalition reply: It is convenient to get around these questions by stating that you are only making decisions about the road itself—but if you have no idea what you are going to put on the road, how is that a transit solution?

This Is Our Flooding Problem

Since last year, the PWSA has had $41 million in funding to fix an urgent public safety issue in the heart of Pittsburgh. Please call 412-255-2423 to ask them, “What’s the holdup?”

As you watch the video above, imagine that Four Mile Run is your neighborhood. In a way, it is.

Those of us who live here see “The Run” as unique, but it has the basics that most neighborhoods share: houses, sidewalks churches, businesses—and a community of people. Imagine these are your streets and homes filling with water, your neighbors becoming trapped on top of their car, your children at risk of drowning.

They are.

If you live in Pittsburgh, you’ve likely traveled over The Run on the Parkway East. You may frequent or live in the better-known neighborhoods above us that get this water first—and more and more of this water ends up in The Run as unchecked development covers acres of land with impervious surfaces like asphalt.

As the flooding steadily worsened over decades, your neighbors were told time and time again that our city lacked funds to fix it. So it was a big deal when PWSA secured the $41 million earmarked for the problem. Now, even with funding finally in place, more than a year has passed and work has not started on this important and necessary project.

Why so much foot-dragging? Unfortunately, there is more to the story—and the details are dirtier than the sewage in our basements.

Please call the PWSA at 412-255-2423 to demand they fix this urgent public safety issue using green solutions.